Wearside Construction

P +61 8 9434 1084
F +61 8 9434 1016
E enquiries at wearsideconstruction dot com dot au (Send us an Email)

11 Erceg Road
Yangebup
Western Australia 6164

We have a large workshop 2500M² fitted out with 10T over head cranes and a 600M² storage warehouse all within the Bibra Lake Industrial area.

We also have a secondary "Clean" workshop which is dedicated solely to Stainless steel and exotic pipework for the Oil and Gas industry

We have the ability to commit one or both workshops to piping and or structural depending on project demand with all necessary tooling.

Both workshops are fitted out to achieve highly functional facilities as well as providing a safe clean environment for it's workforce to operate in.

Additionally we have a vested interest in a Thailand based company UTS from whom we can offer alternative more competitive offshore pricing as well as the ability to increase our overall turnaround time.

UTS have fabricated all aspects of structural and pipe work including such exotics as Schedule 160 chrome/moly high pressure steam pipe and copper nickel.

Recently UTS supplied support columns and truss sections for the Mount Gibson Iron Storage Facility at Geraldton Port, all of which were delivered ahead of schedule and on budget.

Wearside Construction are highly capable of taking any size project and schedule priorities.

Wearside Construction Maintain a skilled site team and all necessary site equipment including, EWP’s, portable power generation and welding capabilities, forklifts, site office’s, lunch rooms, store containers even through to ablutions. Because of this we can mobilise site crews quickly and with minimum fuss within the clients specified timeframe.